All Done, Ready For Launch

That’s it, we’re all done. Two coats of antifoul, prop shaft seal replaced, seacocks lapped and greased, anodes replaced, topsides cleaned and polished, the old holes from the boarding ladder filled and faired and a new outlet for the bilge pump fitted so it no longer drains through the gas locker. The hull is an impressive 1” thick fibreglass where the new outlet is, about 1ft down from the toe rail, good old Westerly know how to lay it on thick.
Stacks Image 115
Stacks Image 117
Back